Saturday Work Session on the GN – Wenatchee West

🖨️ Print
Saturday, February 7, 2026 • Doors open at 9:15 AM, starting at 9:30 PM - 2:00 PM

After a break for a trip to visit friends in Arizona and Hawaii, I am chomping on the bit to get back to work on the model railroad. I know a bunch are scheduled for an op session on this date, but I did get an initial go ahead from one of our crew and potential from another, and mid week is too soon this week and not available next week – so I am going ahead!

There are a number of things in the works. A few are:

  • Narrow benchwork additions for two narrow upgrade sections along one side of the peninsula
  • Cutting and installation of backdrop sections on parts of the peninsula at various levels
  • Running of bus wires on level two of the benchwork
  • Running of loconet cable to the panels C and F
  • Some work in the harbor bridge and paper mill area

The plan is to work from 9:30 am till 12:30 pm and break for some lunch. I will continue afterwards for a bit for those who want to continue after lunch. Let me know if you can make it!

.