There are a number of tasks to choose from for this work session. Here’s what I can think of off the top of my head:
- Continue stringing strip lighting in the peninsula
- Install another Bluepoint turnout control in Appleyard and a couple ground throws
- Valance and Facia installation in a couple areas
- Cut and install subroadbed on branch level up the outer side of the peninsula
- Start installing scenery grid along track following the stream bed on L2
1 of 5 slots filled
